Sewer Connections:Permits are required for all sewer tie-ins, along with an approved town licensed drain layer to perform the work. Applications and criteria for connection information, a list of licensed Drain Layers, as well as our policy on dedicated non-sewer use meter installation(s) are available at the Sewer Department Office. The use of dedicated meters to measure non-sewer use water, for consumption adjustment is allowed when permitted through the Sewer Department. Fees:Sewer
Connection Permits: System's Development Fee: System Development fee for commercial property is $5,000.00 per unit up to 10,000 square feet. Above 10,000 square feet shall be subject to additional charges beyond the original $5,000.00 to be set by the Board on a "case-by-case" basis. Those areas requiring a Pump station are subject to a maintenance fee of $30,000.00 prior to the Town's acceptance. Sump Pumps:Connection of sump pumps to the sewer system is strictly prohibited. Sump pumps contribute substantially to excess water (I & I or Inflow and Infiltration) in the system and add to the annual user fees of the municipal sewer system, which may result in fines to the Town from the Rockland and/or Brockton Treatment Plants. Those
considering purchasing or selling a home in Abington will need to have a sump
pump inspection. All houses may be inspected before sale and all houses seeking
building permits will be inspected as well. The Commission will assist in providing
information as to the best way to re-route existing sump pumps at no charge to
the owner. |